Username
Password
Home
Forgotten Password?
Register Now
Site Map
THE UK CONSTRUCTION INDUSTRY'S MOST UP TO DATE ARTICLE SEARCH |
Search:
Advanced Search
SIKA SHEAR LINKS ADD STRENGTH TO SHEFFIELD CHURCH CONVERSION
Sika Limited
27/02/2008
Sika CarboDur® carbon fibre reinforced plates (CFRP) and pre-fabricated SikaCarbo Shear CFRP shear links have recently been installed on a major refurbishment of the former Crookes Valley Methodist Church.in Sheffield. Property developers Merlin Estates are converting the building into 22 unique, high quality apartments, and the revised use of the building has subjected the internal reinforced concrete support beams to an increase in shear loadings. This required a design solution that would be unobtrusive and increase the shear resistance of the beams without substantially increasing the dead load.
Consultant engineers Capita Symonds in consultation with the Composites Team at Tony Gee and Partners decided upon a combination of Sika CarboDur® carbon fibre reinforced plastic (CFRP) plates and pre-fabricated SikaCarbo Shear CFRP shear links as the solution. Post strengthening of concrete structures using Sika’s CFRP plates has advantages in contrast to alternative solutions such as steel plates, in being much lighter and smaller, therefore being easier and much faster to apply. CFRP plates are also corrosion resistant and have excellent fatigue strength characteristics.
These advanced composite materials are part of Sika Limited’s proven range of CFRP plates and fabrics designed for such use as flexural strengthening, shear upgrades and column confinement as well as many other uses such as strengthening of cut-outs and repairing structural damage.
Specialist contractor V A Crookes (Contracts) Limited bonded the Sika CarboDur® plates linearly to the underside of the floor beams using SikaDur® 30, a specially formulated cold cure epoxy adhesive. This was followed by the bonding of the L shaped CarboShear links at fixed centres along the beam. The links were fitted in pairs to form a U section around the beam section.
Email article
Print article
Was this article useful to you?
Recommend it:
Average (1 votes)
View similar articles:
Concrete
,
Reinforced
,
Flats & Apartments
,
Churches & Places of Worship
People who viewed this article were also interested in
Subject
Supplier
Date Published
Hydro-Brake® helps reduce CSO run-off for Durham
Hydro International
01/11/2003
New Mini Clamp and Link Connectors save time and cost
Abacus Group
26/07/2005
Landmark Arts Council building gets FOAMGLAS® all round...
FOAMGLAS
01/11/2005
BVCPS Hires New Consultant to Further Strengthen its Fu...
Bureau Veritas
01/12/2005
BVCPS Introduces New Brochure Detailing its Global Capa...
Bureau Veritas
08/12/2005
Other articles from Sika Limited
Subject
Date Published
Sika Supply Durable Concrete Solution for Coastal Walkw...
03/07/2008
Sika extends AnchorFix range
27/05/2008
Hard Standing for Southampton Container Terminal Expans...
15/04/2008
Sika Supplies Structural Glazing Solutions
15/10/2007
Sika superior natural finish
14/08/2007
Click here
to report a mis-classified article
Click here
to report an abusive or defamatory article
© CMP information Ltd 2007
Terms and Conditions
Privacy Policy