Username
Password
Home
Forgotten Password?
Register Now
Site Map
THE UK CONSTRUCTION INDUSTRY'S MOST UP TO DATE ARTICLE SEARCH |
Search:
Advanced Search
ARMSTRONG ANNOUNCES THE LAUNCH OF THE NEW IPC 11550 INTEGRATED PLANT CONTROL SYSTEM
Armstrong Integrated Systems Limited
19/03/2007
Armstrong has launched the IPC 11550 integrated plant control system. System designers face an ever-growing need to address the global demand for reliable, energy-efficient and cost-effective solutions. With this in mind the Armstrong IPC 11550 ultra-efficient chilled water plant control system ushers in a new era of efficiency. Aimed at achieving better than 0.45 kW/ton (7.8 COP) operating efficiency on an annual average basis, it dramatically exceeds today's best-in-class levels of 0.75 kW/ton (4.7 COP), for water-cooled systems. With air-cooled all variable speed systems, annual average plant efficiency levels better than 0.95 kW/ton (3.7 COP) can be achieved.
Employing the Hartman LOOP® methodology of chilled water plant control, the IPC 11550 Control System maximizes the benefits of all variable speed plant design. This is a proven control method that employs a patented technique for operating variable speed chilled water plants. Hartman LOOP® technology has been installed in several major facilities for over 5 years and continues to produce energy savings over other control methodologies.
Armstrong is a leading global supplier of quality HVAC and Fluid Flow equipment for residential, commercial and industrial applications. Established in 1934, the company maintains seven manufacturing facilities on three continents.
Email article
Print article
Was this article useful to you?
Recommend it:
Average (0 votes)
View similar articles:
Housebuilding
,
Flats & Apartments
,
Other
,
Offices
,
Retail
,
Other
,
Sheds
,
Laboratories
,
Other
People who viewed this article were also interested in
Subject
Supplier
Date Published
Hydro-Brake® helps reduce CSO run-off for Durham
Hydro International
01/11/2003
New Mini Clamp and Link Connectors save time and cost
Abacus Group
26/07/2005
Landmark Arts Council building gets FOAMGLAS® all round...
FOAMGLAS
01/11/2005
BVCPS Hires New Consultant to Further Strengthen its Fu...
Bureau Veritas
01/12/2005
BVCPS Introduces New Brochure Detailing its Global Capa...
Bureau Veritas
08/12/2005
Other articles from Armstrong Integrated Systems Limited
Subject
Date Published
Armstrong launches Pumpbox fully integrated HVAC pumpin...
17/07/2008
Big Additions To Armstrong’s Integrated Heating Solutio...
07/04/2008
Off-Site Manufacture Keeps London Transport Museum ’S R...
19/02/2008
Off-site manufacture streamlines project for Lewisham P...
28/08/2007
Off-Site Manufacture Speeds The Way For HBOS
27/03/2007
Click here
to report a mis-classified article
Click here
to report an abusive or defamatory article
© CMP information Ltd 2007
Terms and Conditions
Privacy Policy